Construction Closes Hallway Between B & C Building At NCCC
3/08/2010
Construction Closes Hallway Between B & C Building At NCCC
Due to construction in the Memorial Garden, the first floor hallway between B - Building and C - Building (near the elevator) will be closed effective Monday, March 15, 2010 through at least Tuesday, June 1, 2010.
Please use the directions listed below to get from building to building.
IF YOU ARE IN C – BUILDING and WANT TO GET TO B – BUILDING:
Take the hallway from C – Bldg., make a right into D – Bldg., make a right at the corner of D – Bldg. and A – Bldg.,
make another right from A – Bldg. to B-Bldg.
(GO AROUND . . .)
OR
Go to the staircase and go to the second floor of C – Bldg. and take the outdoor walkway between C – Bldg. and B – Bldg.
IF YOU ARE IN B – BUILDING and WANT TO GET TO C – BUILDING:
Take the hallway from B – Bldg., make a left from B – Bldg. to A – Bldg., make a left at the corner of A – Bldg. and D – Bldg.,
make left from D – Bldg. to C-Bldg.
(GO AROUND . . .) OR
Go to the staircase and go to the second floor of B – Bldg. and take the outdoor walkway between B – Bldg. and C – Bldg.
